You have 360 tons of below deck tonnage and 210 tons of above deck cargo on board. You must load 100 tons of liquid mud below deck. How much more deck cargo can you load? See illustration D036DG below.
⢠Use the loading diagram D036DG: below deck tons on the horizontal axis, above deck cargo tons on the vertical axis ⢠Remember you must add the new liquid mud to the existing belowādeck tonnage before plotting ⢠Check whether the point (below deck, above deck) lies on or below the safeāloading boundary curve
⢠What is your total below deck tonnage after you load the 100 tons of liquid mud, and where does that fall on the horizontal axis? ⢠At that belowādeck value, what is the maximum allowed aboveādeck cargo according to the safeāloading curve on the diagram? ⢠How does that maximum allowed value compare with the 210 tons already on deck, and what does that tell you about how much more you can add?
⢠Be sure you are reading long tons on both axes and using the same units as in the question ⢠Verify that you are using the safe loading curve, not the unsafe region above it ⢠Doubleācheck your subtraction when you compare allowed deck cargo to the deck cargo already on board
No comments yet
Be the first to share your thoughts!