The COASTAL DRILLER is operating with a wave clearance of about 20 feet. The out-of-level alarm sounds, and the unit is found to be inclined 0.5-degree bow down. The recommended course of action is to __________.
• Jack-up rig stability and trim control when the unit is already elevated with adequate air gap • Difference between immediate corrective action vs monitoring and preparing • Effects of jacking up or down versus weight transfer on a slight bow-down trim
• Is a 0.5-degree bow-down inclination with 20 feet of wave clearance considered an emergency, or a condition to monitor? • Which options involve actively changing leg positions, and what additional risks can that create when the unit is already jacked up and stable? • Between jacking legs and transferring weight, which is generally preferred as the first response to very small, slowly developing inclinations?
• Confirm whether 0.5° of inclination is within normal monitoring limits for a jack-up with good air gap, according to operating manuals and stability guidance • Check which actions (jacking vs. ballasting/weight transfer) are usually reserved for more serious or worsening inclinations • Verify that any chosen response does not introduce new dynamic loads or sudden changes on the legs without clear necessity
No comments yet
Be the first to share your thoughts!