The COASTAL DRILLER is loaded as shown in the Sample Load Form Number 1 (Rig Move). If the contents of 6 and 7 drill water tanks are discharged, what would be the new height of the transverse metacenter?
The COASTAL DRILLER is loaded as shown in the Sample Load Form Number 1 (Rig Move). If the contents of 6 and 7 drill water tanks are discharged, what would be the new height of the transverse metacenter?
No comments yet
Be the first to share your thoughts!