If a boiler is being prepared for a hydrostatic test as part of a periodic inspection, in accordance with 46 CFR 61, which statement is true?
Water-tube boilers should be filled with water from 70°F to 160°F, and fire-tube boilers should be filled with water from 70°F to 100°F.
Fire-tube boilers should be filled with water from 60°F to 170°F, and water-tube boilers should be filled with water from 60°F to 100°F.
Fire-tube boilers should be filled with water from 70°F to 160°F, and water-tube boilers should be filled with water from 70°F to 100°F.
Water-tube boilers should be filled with water from 60°F to 170°F, and fire-tube boilers should be filled with water from 60°F to 100°F.