Before testing insulation with a megohmmeter, the windings of large machines should be grounded for about 15 minutes just prior to the test. Why is this procedure recommended?
Before testing insulation with a megohmmeter, the windings of large machines should be grounded for about 15 minutes just prior to the test. Why is this procedure recommended?