Your vessel is damaged, and there is no list or trim. The rolling period is short. The freeboard before the damage was 12'02" (3.7 meters). It is now reduced to 3'00" (1 meter). Which action would you take FIRST?
A
Pump out an amidships centerline ballast tank
B
Transfer ballast from the peak tanks to an amidships centerline tank
C
Press up a slack centerline double bottom tank
D
Pump out the marine potable tank located on the starboard side amidships