Who is responsible for the final inspection, ensuring a tank barge is provided with the required equipment and has fittings in good and serviceable condition prior to loading cargo?
• 46 CFR requirements for tank barges and cargo operations • The defined duties of the person in charge (PIC) of loading or transfer operations • Difference between overall ownership responsibility and pre-loading inspection responsibility
• Which person is physically in charge of the cargo transfer and is required to verify equipment and fittings right before loading? • How do the responsibilities of the owner, charterer, and terminal operator differ from the person directly supervising the transfer? • Who must be on scene, knowledgeable of the barge’s condition, and documented as the person in charge according to regulations?
• Identify who the regulations call the person in charge (PIC) for cargo transfer on a tank barge • Confirm which role is required to inspect hoses, connections, and fittings before starting cargo operations • Distinguish between long-term maintenance responsibility and the immediate pre-loading inspection responsibility just before cargo transfer
No comments yet
Be the first to share your thoughts!