Which statement about calibrating a newly installed thermostatic expansion valve is correct?
This procedure is done at the factory with tools not available to a mariner.
No special tools are required as long as the solid state circuit control panels are functioning properly.
The procedure requires a refrigeration wrench and a digital thermometer to measure box temperature.
An accurate thermometer and suction pressure gage are essential to this process.
No comments yet
Be the first to share your thoughts!