Which of the following statements represents the last step to be followed when replacing the power element of the device shown in the illustration? See illustration GS-RA-07.
β’ Identify the device in the illustration as a thermostatic expansion valve (TXV) with a remote power element and sensing bulb. β’ Think about the normal installation sequence when replacing a TXV power element: mechanical mounting, bulb placement, then system tuning. β’ Consider what must be done after the system is back running to ensure the evaporator is neither starved nor flooded.
β’ When you replace the power element and remount the sensing bulb, what adjustment is necessary to confirm the valve is feeding the correct amount of refrigerant? β’ Which of the listed actions would normally be done only during installation, and which would be performed as a final operational check with the system online? β’ How does the power element and sensing bulb affect evaporator superheat, and what must be confirmed after any change to that element?
β’ Verify which choice deals with operational performance of the TXV rather than physical modification of parts. β’ Eliminate any option that would damage or permanently alter the capillary or bulb arrangement. β’ Focus on the step that is normally performed last, with the system running and pressures/temperatures stabilized.
No comments yet
Be the first to share your thoughts!