Which of the following statements indicates compliance with Coast Guard Regulations (46 CFR Part 56) concerning a vessel's bilge system?
All bilge manifold suctions shall be capable of being locally controlled from above the floor plates.
The system must be capable of operation under all practicable conditions after a casualty, whether the vessel is upright or listed.
Peak tanks, chain lockers, and decks over peak tanks may be drained by eductors, ejectors, or hand pumps.
All of the above.
No comments yet
Be the first to share your thoughts!