Which of the following guidelines is considered to reflect good design practices for shipboard steam heating systems?
Wherever possible install vertical runs for condensate piping.
Provide all units with a dirt trap and gate valve in the supply and a check valve on the return.
Provide a dirt pocket and strainer ahead of the steam trap on a unit heater return.
Provide orifice-type bypasses for all traps and automatic valves.
No comments yet
Be the first to share your thoughts!