What statement is true concerning the checks to be undertaken in the "checks prior to transfer" section of the bunkering safety checklist where the transfer is from barge-to-ship?
⢠Person in Charge (PIC) responsibilities during bunkering operations ⢠Purpose of the bunkering safety checklist and why it is done before transfer starts ⢠How coordination between barge and ship affects safety during fuel transfers
⢠Think about who physically controls valves, hoses, and emergency shutdowns on BOTH sides of the transfer connection. ⢠Consider whether the checklist is meant to confirm only one side is ready, or that the entire transfer system (barge + ship) is safe and synchronized. ⢠Ask yourself: if something goes wrong, who must already have agreed on procedures, signals, and emergency actions before starting the transfer?
⢠Verify who is formally designated as PIC on each unit (barge and ship) during bunkering. ⢠Check whether safe bunkering requires mutual agreement on start/stop signals, maximum transfer rates, and emergency shutdown procedures. ⢠Confirm whether a one-sided check (only barge or only ship) would leave any critical safety gaps in the transfer operation.
No comments yet
Be the first to share your thoughts!