What project management scheduling chart is a bar chart with the activity or task descriptions displayed on the left and listed vertically from top to bottom, and the calendar displayed on the top and laid out horizontally from left to right?
β’ Bar chart style project schedule where time runs left to right β’ Difference between time-based bar charts and network diagrams (boxes and arrows) β’ Common project management charts: PERT, CPM, and one named after a person
β’ Which chart have you most often seen showing tasks as horizontal bars along a calendar timeline? β’ Which of these options are usually network diagrams (nodes and arrows) rather than simple bar charts? β’ Which option is not typically used for project scheduling at all?
β’ Confirm which chart type is specifically known for horizontal bars across a timeline β’ Eliminate any charts that are typically flow/network diagrams instead of bar charts β’ Eliminate any chart type that is not a scheduling tool in project management