To pump bilge water out of the port pump room on the DEEP DRILLER, using the number 2 bilge pump, open port-side valve __________.
• Bilge system line-up diagrams for the DEEP DRILLER • How numbered valves correspond to specific compartments (port pump room vs. other spaces) • Relationship between the number 2 bilge pump suction manifold and individual bilge suction valves
• On a typical bilge system, how do you trace which valve connects the selected pump (number 2) to the port pump room bilge suction? • Looking at the DEEP DRILLER’s bilge and ballast diagram, which valve number is shown on the port-side bilge suction line from the port pump room to the common manifold? • Are there any valves in the choices that clearly belong to a different space or function (e.g., starboard side, engine room, ballast line)?
• Confirm on the bilge system schematic which valve number is labeled on the port pump room bilge suction going to bilge pump #2. • Verify that the chosen valve is on the port side, not starboard, and is a bilge suction, not a discharge or ballast valve. • Make sure there is no additional isolation valve in that line that would change which valve must be opened for suction from the port pump room.
No comments yet
Be the first to share your thoughts!