The initial tension set in the mooring system of a MODU establishes the __________.
minimum amount of ballast needed to keep the vessel at operating draft during normal drilling operations
maximum time it will take to disconnect the riser package in the event of a storm
distance the unit can be offset from the wellbore before the restoring forces oppose the environmental forces
maximum water depth at which drilling operations can be conducted
No comments yet
Be the first to share your thoughts!