The effectiveness of an off-line water wash of a GE LM2500 gas turbine engine can be enhanced by doing which of the following?
Motoring the engine just short of idle speed.
Washing the power turbine while still hot.
Stroking the Variable Stator Vanes to the maximum open position.
Applying the power turbine brake.
No comments yet
Be the first to share your thoughts!