The DEEP DRILLER is operating as shown in Sample Load Form #4 (Drilling). Assume ballast added or discharged to remain at a constant draft is at a VCG of 10 feet. How much non-liquid load would have to be removed from an average height of 130 feet above the keel to meet the maximum allowable KG at a draft of 60 feet for winds greater than 70 knots?
The DEEP DRILLER is operating as shown in Sample Load Form #4 (Drilling). Assume ballast added or discharged to remain at a constant draft is at a VCG of 10 feet. How much non-liquid load would have to be removed from an average height of 130 feet above the keel to meet the maximum allowable KG at a draft of 60 feet for winds greater than 70 knots?