The DEEP DRILLER is loaded as shown in the Sample Load Form #3 (Preparing to Drill). If the liquid mud in mud pit #1 (see table 8) is dumped, what would be the new draft?
The DEEP DRILLER is loaded as shown in the Sample Load Form #3 (Preparing to Drill). If the liquid mud in mud pit #1 (see table 8) is dumped, what would be the new draft?
No comments yet
Be the first to share your thoughts!