The DEEP DRILLER is loaded as shown in the Sample Load Form #3 (Preparing to Drill). If the liquid mud in mud pit #1 (see table 8) is dumped, what would be the new draft?
A
60 feet 9.6 inches
B
59 feet 9.3 inches
C
59 feet 2.7 inches
D
56 feet 10.9 inches
Loading interactive features...
Question 1 / 2066636ee728f7522a1c5178d3
Question 1 of 2066636ee728f7522a1c5178d3
The DEEP DRILLER is loaded as shown in the Sample Load Form #3 (Preparing to Drill). If the liquid mud in mud pit #1 (see table 8) is dumped, what would be the new draft?
The DEEP DRILLER is loaded as shown in the Sample Load Form #3 (Preparing to Drill). If the liquid mud in mud pit #1 (see table 8) is dumped, what would be the new draft?