The DEEP DRILLER is loaded as shown in Sample Load Form #5 (Survival). While the unit is deballasting, starboard valve 5 fails in the closed position. You may deballast from tank 2S by pumping from tank 1S after opening valves 6 and __________.
A
8
B
7
C
2
D
1