The COASTAL DRILLER is loaded as shown in the Sample Load Form Number 1 (Rig Move). If the drill water in drill water tanks 6 and 25 are discharged, what is the new draft?
The COASTAL DRILLER is loaded as shown in the Sample Load Form Number 1 (Rig Move). If the drill water in drill water tanks 6 and 25 are discharged, what is the new draft?
No comments yet
Be the first to share your thoughts!