The COASTAL DRILLER is loaded as shown in the Sample Load Form Number 1 (Rig Move). If the contents of the No.1 drill water tank are discharged, what would be the new LCG?
The COASTAL DRILLER is loaded as shown in the Sample Load Form Number 1 (Rig Move). If the contents of the No.1 drill water tank are discharged, what would be the new LCG?