The COASTAL DRILLER is in transit loaded as shown in the Sample Load Form Number 1 (Rig Move). What would be the new KGT if, during the move, 170.9 kips of fuel oil is consumed from Diesel Oil Tanks 13 and 14?
The COASTAL DRILLER is in transit loaded as shown in the Sample Load Form Number 1 (Rig Move). What would be the new KGT if, during the move, 170.9 kips of fuel oil is consumed from Diesel Oil Tanks 13 and 14?