On the DEEP DRILLER, when using the starboard #2 ballast pump to provide water to the main deck from the sea, it is necessary to open valves __________.
A
38, 47, 45, 46
B
37, 36, 46, 47
C
37, 35, 36, 45
D
38, 47
Loading interactive features...
Question 1 / 2066636ee728f7522a1c51792f
Question 1 of 2066636ee728f7522a1c51792f
On the DEEP DRILLER, when using the starboard #2 ballast pump to provide water to the main deck from the sea, it is necessary to open valves __________.
On the DEEP DRILLER, when using the starboard #2 ballast pump to provide water to the main deck from the sea, it is necessary to open valves __________.