On the COASTAL DRILLER, in case one of the two bilge pits is flooded, the other can operate through a(n)__________.
On the COASTAL DRILLER, in case one of the two bilge pits is flooded, the other can operate through a(n)__________.
No comments yet
Be the first to share your thoughts!