On an Inmarsat-C system, what is the...
All questions
Question 1 of 27070
CqOs2BwTT2Pz2CO6uJTj
On an Inmarsat-C system, what is the importance of a successful “SYNC” indication after power up?
Show Hint
Show Illustration
Chat with Navigator AI
A
The system is not yet locked on to the NCS signal until a log-in command is performed.
B
Sufficient signal strength on the NCS common channel is being received.
C
There is company telex traffic being received on the NCS common channel.
D
The NCS has confirmed log-in status is on so routine traffic can be sent and received.
Discussion
(0)
Show More
Back
Back
Back
Question 1 of 27070
CqOs2BwTT2Pz2CO6uJTj
Q
On an Inmarsat-C system, what is the importance of a successful “SYNC” indication after power up?
A
The system is not yet locked on to the NCS signal until a log-in command is performed.
B
Sufficient signal strength on the NCS common channel is being received.
C
There is company telex traffic being received on the NCS common channel.
D
The NCS has confirmed log-in status is on so routine traffic can be sent and received.
Back
Next
Discussion