No.1 SSDG was operating in parallel with No.2 SSDG in supplying the 480 VAC main bus while sharing the electrical load evenly. As a result of a problem, if No.1 SSDG begins to motorize, but the generator has not yet tripped out by the action of the reverse power relay, what would be the indication of this?
No.1 SSDG was operating in parallel with No.2 SSDG in supplying the 480 VAC main bus while sharing the electrical load evenly. As a result of a problem, if No.1 SSDG begins to motorize, but the generator has not yet tripped out by the action of the reverse power relay, what would be the indication of this?