No.1 SSDG was operating in parallel with No.2 SSDG in supplying the 480 VAC main bus while sharing the electrical load evenly. As a result of a problem, if No.1 SSDG begins to motorize, but the generator has not yet tripped out by the action of the reverse power relay, what would be the indication of this?