It is necessary to replace a branch suction section of bilge system piping within the machinery space. The machinery space is 100' in length and 85' in breadth. The molded depth of the bulkhead deck is 25'. Which of the listed pipe sizes should be used?
It is necessary to replace a branch suction section of bilge system piping within the machinery space. The machinery space is 100' in length and 85' in breadth. The molded depth of the bulkhead deck is 25'. Which of the listed pipe sizes should be used?