In the absence of the manufacturer's instructions, a good procedure in reassembling a high-pressure boiler gauge glass is to tighten the nuts in pairs and __________.
A
start at the top and work down
B
begin with the center bolts and work toward the ends
C
start at the bottom and work up
D
begin with the end bolts and work toward the center
Loading interactive features...