If the engineer on watch has reason to doubt the accuracy of the water level showing in the boiler gauge glass, he should FIRST __________.
blowdown the gauge glass
open the auxiliary feed line
start the standby feed pump
replace the gauge glass
No comments yet
Be the first to share your thoughts!