If a modern brushless alternator is to be inactive for an extended period of time, which of the following actions should be taken?
It should be disconnected from the prime mover and raised off its bearing supports.
Insulation resistance readings should be taken weekly to ensure resistance is not deteriorating.
The disconnect switch or links should be opened and the space heater energized.
The disconnect switch or links should be closed and the space heater de-energized.
No comments yet
Be the first to share your thoughts!