During the operation of a five box refrigeration system, using a fixed capacity compressor, two additional boxes came on line with the two boxes already in the active cooling process. At the beginning of the cooling period for the two additional boxes, the operating conditions of the system would require the quantity (flow rate) of refrigerant to the compressor suction to do what?
During the operation of a five box refrigeration system, using a fixed capacity compressor, two additional boxes came on line with the two boxes already in the active cooling process. At the beginning of the cooling period for the two additional boxes, the operating conditions of the system would require the quantity (flow rate) of refrigerant to the compressor suction to do what?
No comments yet
Be the first to share your thoughts!