Before deballasting to survival draft in the event of predicted heavy weather, the DEEP DRILLER Operations Manual recommends that the mooring lines be slacked __________.
Before deballasting to survival draft in the event of predicted heavy weather, the DEEP DRILLER Operations Manual recommends that the mooring lines be slacked __________.