Assuming that the recommended hatch loading sequence is followed, how many long tons of iron ore may be loaded through hatches 5 & 7 while using a single belt loader, to arrive at a desired mean keel draft of 25'-02"? (Use the Guidance Manual for Loading M.V. GRAND HAVEN.)
Assuming that the recommended hatch loading sequence is followed, how many long tons of iron ore may be loaded through hatches 5 & 7 while using a single belt loader, to arrive at a desired mean keel draft of 25'-02"? (Use the Guidance Manual for Loading M.V. GRAND HAVEN.)
No comments yet
Be the first to share your thoughts!