Assuming that the recommended hatch loading sequence is followed, how many long tons of iron ore may be loaded through hatches 2, 6, & 10, while using a single belt loader, to arrive at a desired mean keel draft of 27'-07"? (use the Guidance Manual for Loading M.V. GRAND HAVEN)
Assuming that the recommended hatch loading sequence is followed, how many long tons of iron ore may be loaded through hatches 2, 6, & 10, while using a single belt loader, to arrive at a desired mean keel draft of 27'-07"? (use the Guidance Manual for Loading M.V. GRAND HAVEN)
No comments yet
Be the first to share your thoughts!