Assuming that the recommended hatch loading sequence is followed, how many long tons of iron ore may be loaded through hatch No. 1 while using a single belt loader to arrive at a desired mean keel draft of 29'-11"? (use the Guidance Manual for Loading M.V. GRAND HAVEN)