After an emergency shoring installation has been completed, the __________.
Show Hint
Show Illustration
Chat with Navigator AI
A
repair is completed and no further action is needed
B
shoring should be frequently inspected for looseness
C
damaged plating should be straightened by heating
D
timbers are nailed in place to prevent looseness