According to U.S. regulations, how often are you are required to test cargo discharge piping?
• 46 CFR cargo gear and piping test intervals for tank vessels • Difference between tests required before initial use and periodic tests afterward • How U.S. regulations treat cargo discharge piping vs. cargo hoses
• Think about how critical cargo discharge piping is to pollution prevention and whether regulators would choose a shorter or longer inspection interval for such systems. • Compare this interval with other required inspections on tank vessels (like cargo hoses or pressure tests). Is piping treated more like a hose or like a major fixed system? • Ask yourself which of the listed time periods sounds most consistent with a regularly scheduled, logbook-documented inspection cycle.
• Verify in 46 CFR the specific section on cargo discharge piping tests and note the stated interval in months. • Confirm that the interval applies to all cargo discharge piping in use and not only after major repairs or alterations. • Make sure you are not confusing the test interval for cargo hoses or relief valves with that for cargo discharge piping.
No comments yet
Be the first to share your thoughts!