A tanker's mean draft is 32'-05". At this draft, the TPI is 178. The mean draft after loading 1200 tons will be __________.
• Tons Per Inch Immersion (TPI) – what it represents and how it links added weight to change in draft • Relationship: Change in draft (inches) = Weight loaded (tons) ÷ TPI • Converting a decimal number of inches into feet and inches and then comparing with multiple‑choice options
• First, calculate how many inches of immersion correspond to loading 1200 tons using the given TPI. What is the exact formula, and what units must you use? • Take your calculated change in draft (in inches) and add it to the original mean draft of 32'-05". How do you correctly combine feet and inches here? • Once you have the new draft as feet and inches (it may not come out to a whole inch), which answer choice is numerically closest to your computed value?
• Be sure you actually divide weight (1200 tons) by TPI (178 tons per inch) to get change in draft in inches. • Check that you do not convert the original draft into decimal feet and then forget to convert back when comparing with the answer choices. • After adding the inches, verify whether you cross 12 inches, and if so, convert that excess into an extra foot before matching the choices.
No comments yet
Be the first to share your thoughts!